Solar Power Plant 

The City of Manteca's solar power generation plant is located at the Public Works Corporation Yard on Wetmore Street. The primary goal of the plant is to reduce dependence on grid power. The power grid at this location suffers from a lack of adequate power during peak demand periods. Additionally, when the power plant generates more energy than is being consumed, the excess energy is routed into the PG&E system and essentially "runs the meter backwards," crediting the City for excess energy produced. The charts below provide detailed information about the solar power plant's energy production.

 

Technical Data for our Photo Voltaic Power Plant:

Location : City of Manteca Corporation Yard
265 E Wetmore Ave., Manteca, CA
Inverters:  3 x Sunny Boy 2500
Maximum output:  5,528 W

Controller: 

1 x Sunny Boy Control Plus

The symbols for individual devices show a few measured values.
Enlarge a device by clicking on it with the left mouse button.
Clicking with the right mouse button scales it down again.


Notes:


     "Pac"  = Alternating current power being produced by 
         each of the three inverters in real time.

 
"E-total" = Alternating current power produced
              since the system was turned on.

     Multiply
"E-total" by $0.17 to calculate the money saved.